Bureau of National statistics
Agency for Strategic planning and reforms of the Republic of Kazakhstan
    Key indicators
    18,5%
    In January-July 2025, the volume of construction work increased by 18,5% and amounted to 4073,6 billion tenge.
    92,1%
    Of the total volume of construction works in the republic, private construction organizations 92,1%, foreign – 7,2% and state – 0,7% were performed.
    Volume of completed construction works

    The increase in the volume of construction work in January-July 2025 compared toJanuary-July 2024 is associated with construction and repair of structures (by 27,5%) and-residential buildings (by 15,6%).

    By types of construction work (services) performed in January-July 2025, the largest share is occupied by construction of non-residential buildings (21,9% in the total volume), roads, railways and subway (23,9%) and residential buildings (13,4%).

    Dynamic tables

    In the regional context, an increase in the volume of construction work was observed in eighteen regions of the republic. Significant growth was noted regions of Kostanay (by 40,4%), Kyzylorda (by 37%), Turkistan (by 34,6%), Soltustik Kazakhstan (by 34,2%),Batys Kazakhstan (by 33,4%), Akmola (by 32,7%), Mangystau (by 28,1%), Almaty (by 26%), Aktobe (by 25,6%), Zhetisu (by 23,9%), Karagandy regions (by 21,8%) and in the cities Almaty (by 35,6%), Astana (by 33,9%) and Shymkent (by 18,8%).

    The volume of completed construction works (services)
    Total, thousand tenge July 2025 as a percentage to January-July 2025 as a percentage to January-July 2024 As a percentage of the republican volume
    June 2025 July 2024
    Republic of Kazakhstan  4 073 625 810 58,0 118,4 118,5 100,0
    Abay 115 495 292 58,2 123,9 118,7 2,8
    Akmola 141 100 892 62,0 86,1 132,7 3,5
    Aktobe 176 652 778 67,6 143,0 125,6 4,3
    Almaty 176 151 746 55,7 107,1 126,0 4,3
    Atyrau 281 951 858 38,3 68,8 63,4 6,9
    Batys Kazakhstan 143 050 908 68,0 113,0 133,4 3,5
    Zhambyl 162 370 745 37,6 123,6 113,1 4,0
    Zhetisu 149 987 614 48,8 81,9 123,9 3,7
    Karagandy 320 617 568 74,2 119,3 121,8 7,9
    Kostanay 152 582 156 51,9 105,8 140,4 3,7
    Kyzylorda 136 424 074 60,1 110,4 137,0 3,4
    Mangystau 176 560 177 65,3 119,6 128,1 4,3
    Pavlodar 163 004 624 41,7 114,2 113,4 4,0
    Soltustik Kazakhstan 92 355 798 44,7 179,6 134,2 2,3
    Turkistan 270 733 604 35,8 241,1 134,6 6,6
    Ulytau 54 236 150 42,4 82,8 97,1 1,3
    Shygys Kazakhstan 186 202 284 124,5 118,4 105,9 4,6
    Astana city 626 431 187 73,9 134,1 133,9 15,4
    Almatycity 415 376 405 61,1 133,7 135,6 10,2
    Shymkent city 132 339 950 46,4 111,8 118,8 3,3
    Spreadsheets
    Commissioning of residential buildings

    In January-July 2025, the total area of new facilities put into operation amounted to 12802,9 thousand square meters.

    Dynamic table

    The total area of housing commissioned increased by 5,2% compared to January-July 2024 and amounted to 9380,7 thousand sq.m., of which 5995,5 thousand sq.m. - multi-apartment and 3285 thousand sq.m. - individual houses. Most of the housing – 8748,2 thousand sq.m. or 93,3% was put into operation by private developers, of which the population is 3404,7 thousand square meters.

    Total area of commissioned residential buildings
    Residential buildings commissioned Including developers
    sq. meters of total area as a percentage by January-July 2024 state property private property of them foreign property
    population as a percentage by January-July 2024
    Republic of Kazakhstan 9 380 741 105,2 439 819 8 748 176 3 404 698 98,5 192 746
    Abay 129 147 77,3 11 119 118 028 46 761 113,3 -
    Akmola 310 981 112,4 1 503 306 128 146 838 99,6 3 350
    Aktobe 436 049 102,3 38 423 397 626 255 391 108,6 -
    Almaty 752 727 120,5 19 017 641 081 509 083 123,9 92 629
    Atyrau 303 292 88,4 - 303 292 239 249 92,3 -
    Batys Kazakhstan 259 385 102,1 2 655 250 896 141 867 83,5 x
    Zhambyl 366 382 103,0 32 243 334 139 280 783 90,4 -
    Zhetisu 146 511 109,4 17 644 128 867 72 175 86,5 -
    Karagandy 280 089 88,3 4 018 276 071 35 981 91,2 -
    Kostanay 292 206 103,2 11 656 280 550 52 163 59,5 -
    Kyzylorda 434 172 103,2 6 213 427 959 374 982 95,5 -
    Mangystau 281 638 63,3 8 236 262 742 131 276 88,2 10 660
    Pavlodar 175 835 100,2 32 293 143 542 114 012 123,4 -
    Soltustik Kazakhstan 109 710 106,8 16 719 92 237 75 710 103,8 x
    Turkistan 528 305 114,6 93 662 434 643 359 300 92,4 -
    Ulytau 54 642 158,2 16 599 38 043 29 168 110,8 -
    Shygys Kazakhstan 151 262 103,5 46 006 86 741 47 815 113,0 x
    Astana city 2 190 417 113,6 63 066 2 112 019 30 736 145,2 15 332
    Almaty city 1 583 518 110,9 18 747 1 519 099 225 857 92,2 45 672
    Shymkent city 594 473 100,6 - 594 473 235 551 97,4 -

    In the field of education and healthcare in January-July 2025 118 general education schools for 128129 student places, 23 preschool institutions for 3879 places,1 hospital for 390 places and 45 clinic for 1983 visits per shift were put into operation.

    Spreadsheets
    Glossary

    Construction and installation works - construction work on the construction of buildings and structures, expansion, reconstruction and technical re-equipment; work on the installation of power, technological and other equipment.

    Construction object - a separate building or structure with all related equipment.Inventory, tools, galleries, flyovers, internal engineering networks and communications, for the construction (reconstruction. expansion) of which an independent object estimate is compiled.

    Methodological explanations

    Construction organizations include all general construction and specialized organizations, including repair and construction organizations. The main activity of construction organizations is to perform work under contracts with customers related to the type of economic activity "Construction" in accordance with the state "General Classifier of types of Economic Activities (GCTEA).

    The volume of construction work includes the cost of construction work performed by enterprises engaged in construction activities under concluded construction contracts, which includes construction of new facilities, major and current repairs, reconstruction, modernization of residential and non-residential buildings, engineering structures.

    The index of the physical volume of construction works (services) is determined by the ratio of the volumes of completed construction works of the analyzed period to the previous period in actual prices, taking into account the deflator (price index).

    The total area of a residential building (residential building) is calculated as the sum of the total areas of all dwellings and the areas of all non-residential premises, as well as the areas of parts of a residential building that are common property.

    More detailed methodological explanations are available at the following links:


    Release responsible:
    Department of Production and Environment statistics
    Department Director:
    A.Isabekova
    Теl. +7 7172 749056
    Executor:
    O.Edel
    Tel. +7 7172 749313
    E-mail: o.edel@aspire.gov.kz
    Address:
    010000. Astana city
    Mangilik el avenue. 8
    House of Ministries. Entrance 4