Bureau of National statistics
Agency for Strategic planning and reforms of the Republic of Kazakhstan
    Key indicators
    12.7%
    In January 2025, the volume of construction work increased by 12.7% and amounted to 140.5 billion tenge.
    81.6%
    Of the total volume of construction work in the republic, private construction organizations – 81.6%, foreign – 17.8% and state – 0.6% were performed.
    Volume of completed construction works

    The increase in the volume of construction work in January 2025 compared to January 2024 is associated with construction and repair of non-residential buildings (by 42.2%) and structures (by 15%).

    By types of construction work (services) performed in January 2025, the largest share is occupied by construction of non-residential buildings (36.9% in the total volume), highways (17.6) and residential buildings (6.2%).

    Dynamic tables

    In the regional context, an increase in the volume of construction work was observed in eighteen regions of the republic. Significant growth was noted in the city of Shymkent (by 2.9 times), regions of Mangystau (by 2.7 times), Akmola (by 2.3 times), Zhetisu (by 2.1 times), Batys Kazakhstan (by 86.2%), Abay (by 74.8%), Shygys Kazakhstan (by 69.7%), Kyzylorda (by 67.2%), Pavlodar (by 49.7%), Kostanay (by 45.6%), Zhambyl (by 33.1%), Ulytau (by 32.3%), Karagandy (by 23.4%) and in the city of Astana (by 71.3%).

    The volume of completed construction works (services)
    Total, thousand tenge January 2025 as a percentage to As a percentage of the republican volume
    December 2024 January 2024
    Republic of Kazakhstan 140 490 911 6,9 112,7 100,0
    Abay 1 628 967 2,5 174,8 1,2
    Akmola 5 477 183 7,5 232,1 3,9
    Aktobe 6 438 383 7,2 104,4 4,6
    Almaty 8 852 533 7,2 112,2 6,3
    Atyrau 18 398 681 11,7 41,3 13,1
    Batys Kazakhstan 5 349 961 7,6 186,2 3,8
    Zhambyl 6 797 603 7,4 133,1 4,8
    Zhetisu 1 399 010 1,2 211,8 1,0
    Karagandy 6 374 481 6,4 123,4 4,6
    Kostanay 4 953 379 7,0 145,6 3,5
    Kyzylorda 5 212 211 7,8 167,2 3,7
    Mangystau 8 464 009 6,4 265,5 6,0
    Pavlodar 3 838 945 5,5 149,7 2,7
    Soltustik Kazakhstan 1 418 422 2,3 120,4 1,0
    Turkistan 2 637 109 1,7 96,0 1,9
    Ulytau 2 661 391 7,9 132,3 1,9
    Shygys Kazakhstan 7 841 281 10,3 169,7 5,6
    Astana city 28 431 788 11,0 171,3 20,2
    Almaty city 8 677 350 5,7 115,1 6,2
    Shymkent city 5 638 224 8,1 290,1 4,0
    Spreadsheets
    Commissioning of residential buildings

    In January 2025, the total area of new facilities put into operation amounted to 942.8 thousand square meters

    Dynamic table

    The total area of housing commissioned decreased by 26.9% compared to January 2024 and amounted to 766.1 thousand sq.m., of which 432 thousand sq.m. - multi-apartment and 329.7 thousand sq.m. - individual houses. Most of the housing – 736.3 thousand sq.m. or 96.1% was put into operation by private developers, of which the population is 367.4 thousand square meters.

    Total area of commissioned residential buildings
    Residential buildings commissioned Including developers
    sq. meters of total area as a percentage by January 2024 state property private property of them foreign property
    population as a percentage by January 2024
    Republic of Kazakhstan 766 105 73,1 29 845 736 260 367 442 123,9 -
    Abay 9 039 143,8 - 9 039 1 632 147,4 -
    Akmola 15 561 29,9 - 15 561 15 442 75,7 -
    Aktobe 31 971 70,3 - 31 971 31 971 407,6 -
    Almaty 50 895 67,4 - 50 895 35 889 219,8 -
    Atyrau 27 537 90,7 - 27 537 26 252 86,5 -
    Batys Kazakhstan 25 916 101,5 1 476 24 440 16 878 66,1 -
    Zhambyl 41 432 134,8 - 41 432 31 498 199,2 -
    Zhetisu 8 837 111,5 - 8 837 8 837 111,5 -
    Karagandy 21 226 106,0 - 21 226 5 262 218,3 -
    Kostanay 23 851 30,5 - 23 851 12 564 79,3 -
    Kyzylorda 75 444 118,9 6 213 69 231 48 473 94,0 -
    Mangystau 12 182 61,7 - 12 182 12 182 61,7 -
    Pavlodar 6 875 190,5 - 6 875 3 563 98,8 -
    Soltustik Kazakhstan 2 583 99,8 - 2 583 2 262 94,1 -
    Turkistan 33 764 104,6 - 33 764 33 764 104,6 -
    Ulytau 3 571 - 3 409 162 162 - -
    Shygys Kazakhstan 4 623 112,8 - 4 623 4 623 112,8 -
    Astana city 95 287 27,0 - 95 287 4 709 182,2 -
    Almaty city 226 081 143,5 18 747 207 334 57 653 200,3 -
    Shymkent city 49 430 123,0 - 49 430 13 826 176,1 -

    In the field of education and healthcare in January 2025 3 general education schools for 3090 student places and 2 preschool institutions for 600 places.

    Spreadsheets
    Glossary

    Construction and installation work – construction work on the construction of buildings and structures, expansion, reconstruction and technical re-equipment; work on the installation of power, technological and other equipment.

    Construction object – a separate building or structure with all related equipment, inventory, tools, galleries, flyovers, internal engineering networks and communications, for the construction (reconstruction, expansion) of which an independent object estimate is compiled.

    Methodological explanations

    Construction organizations include all general construction and specialized organizations, including repair and construction organizations. The main activity of construction organizations is to perform work under contracts with customers related to the type of economic activity "Construction" in accordance with the state "General Classifier of types of Economic Activities (GCTEA).

    The volume of construction work includes the cost of construction work performed by enterprises engaged in construction activities under concluded construction contracts, which includes construction of new facilities, major and current repairs, reconstruction, modernization of residential and non-residential buildings, engineering structures.

    The index of the physical volume of construction works (services) is determined by the ratio of the volumes of completed construction works of the analyzed period to the previous period in actual prices, taking into account the deflator (price index).

    The total area of a residential building (residential building) is calculated as the sum of the total areas of all dwellings and the areas of all non-residential premises, as well as the areas of parts of a residential building that are common property.

    More detailed methodological explanations are available at the following links:


    Release responsible:
    Department of Production and Environment statistics
    Department Director:
    A.Isabekova
    Теl. +7 7172 749056
    Executor:
    O.Edel
    Tel. +7 7172 749313
    E-mail: o.edel@aspire.gov.kz
    Address:
    010000. Astana city
    Mangilik el avenue. 8
    House of Ministries. Entrance 4