The increase in the volume of construction work in January 2025 compared to January 2024 is associated with construction and repair of non-residential buildings (by 42.2%) and structures (by 15%).
By types of construction work (services) performed in January 2025, the largest share is occupied by construction of non-residential buildings (36.9% in the total volume), highways (17.6) and residential buildings (6.2%).
In the regional context, an increase in the volume of construction work was observed in eighteen regions of the republic. Significant growth was noted in the city of Shymkent (by 2.9 times), regions of Mangystau (by 2.7 times), Akmola (by 2.3 times), Zhetisu (by 2.1 times), Batys Kazakhstan (by 86.2%), Abay (by 74.8%), Shygys Kazakhstan (by 69.7%), Kyzylorda (by 67.2%), Pavlodar (by 49.7%), Kostanay (by 45.6%), Zhambyl (by 33.1%), Ulytau (by 32.3%), Karagandy (by 23.4%) and in the city of Astana (by 71.3%).
Total, thousand tenge | January 2025 as a percentage to | As a percentage of the republican volume | ||
---|---|---|---|---|
December 2024 | January 2024 | |||
Republic of Kazakhstan | 140 490 911 | 6,9 | 112,7 | 100,0 |
Abay | 1 628 967 | 2,5 | 174,8 | 1,2 |
Akmola | 5 477 183 | 7,5 | 232,1 | 3,9 |
Aktobe | 6 438 383 | 7,2 | 104,4 | 4,6 |
Almaty | 8 852 533 | 7,2 | 112,2 | 6,3 |
Atyrau | 18 398 681 | 11,7 | 41,3 | 13,1 |
Batys Kazakhstan | 5 349 961 | 7,6 | 186,2 | 3,8 |
Zhambyl | 6 797 603 | 7,4 | 133,1 | 4,8 |
Zhetisu | 1 399 010 | 1,2 | 211,8 | 1,0 |
Karagandy | 6 374 481 | 6,4 | 123,4 | 4,6 |
Kostanay | 4 953 379 | 7,0 | 145,6 | 3,5 |
Kyzylorda | 5 212 211 | 7,8 | 167,2 | 3,7 |
Mangystau | 8 464 009 | 6,4 | 265,5 | 6,0 |
Pavlodar | 3 838 945 | 5,5 | 149,7 | 2,7 |
Soltustik Kazakhstan | 1 418 422 | 2,3 | 120,4 | 1,0 |
Turkistan | 2 637 109 | 1,7 | 96,0 | 1,9 |
Ulytau | 2 661 391 | 7,9 | 132,3 | 1,9 |
Shygys Kazakhstan | 7 841 281 | 10,3 | 169,7 | 5,6 |
Astana city | 28 431 788 | 11,0 | 171,3 | 20,2 |
Almaty city | 8 677 350 | 5,7 | 115,1 | 6,2 |
Shymkent city | 5 638 224 | 8,1 | 290,1 | 4,0 |
In January 2025, the total area of new facilities put into operation amounted to 942.8 thousand square meters
The total area of housing commissioned decreased by 26.9% compared to January 2024 and amounted to 766.1 thousand sq.m., of which 432 thousand sq.m. - multi-apartment and 329.7 thousand sq.m. - individual houses. Most of the housing – 736.3 thousand sq.m. or 96.1% was put into operation by private developers, of which the population is 367.4 thousand square meters.
Residential buildings commissioned | Including developers | ||||||
---|---|---|---|---|---|---|---|
sq. meters of total area | as a percentage by January 2024 | state property | private property | of them | foreign property | ||
population | as a percentage by January 2024 | ||||||
Republic of Kazakhstan | 766 105 | 73,1 | 29 845 | 736 260 | 367 442 | 123,9 | - |
Abay | 9 039 | 143,8 | - | 9 039 | 1 632 | 147,4 | - |
Akmola | 15 561 | 29,9 | - | 15 561 | 15 442 | 75,7 | - |
Aktobe | 31 971 | 70,3 | - | 31 971 | 31 971 | 407,6 | - |
Almaty | 50 895 | 67,4 | - | 50 895 | 35 889 | 219,8 | - |
Atyrau | 27 537 | 90,7 | - | 27 537 | 26 252 | 86,5 | - |
Batys Kazakhstan | 25 916 | 101,5 | 1 476 | 24 440 | 16 878 | 66,1 | - |
Zhambyl | 41 432 | 134,8 | - | 41 432 | 31 498 | 199,2 | - |
Zhetisu | 8 837 | 111,5 | - | 8 837 | 8 837 | 111,5 | - |
Karagandy | 21 226 | 106,0 | - | 21 226 | 5 262 | 218,3 | - |
Kostanay | 23 851 | 30,5 | - | 23 851 | 12 564 | 79,3 | - |
Kyzylorda | 75 444 | 118,9 | 6 213 | 69 231 | 48 473 | 94,0 | - |
Mangystau | 12 182 | 61,7 | - | 12 182 | 12 182 | 61,7 | - |
Pavlodar | 6 875 | 190,5 | - | 6 875 | 3 563 | 98,8 | - |
Soltustik Kazakhstan | 2 583 | 99,8 | - | 2 583 | 2 262 | 94,1 | - |
Turkistan | 33 764 | 104,6 | - | 33 764 | 33 764 | 104,6 | - |
Ulytau | 3 571 | - | 3 409 | 162 | 162 | - | - |
Shygys Kazakhstan | 4 623 | 112,8 | - | 4 623 | 4 623 | 112,8 | - |
Astana city | 95 287 | 27,0 | - | 95 287 | 4 709 | 182,2 | - |
Almaty city | 226 081 | 143,5 | 18 747 | 207 334 | 57 653 | 200,3 | - |
Shymkent city | 49 430 | 123,0 | - | 49 430 | 13 826 | 176,1 | - |
In the field of education and healthcare in January 2025 3 general education schools for 3090 student places and 2 preschool institutions for 600 places.
Construction and installation work – construction work on the construction of buildings and structures, expansion, reconstruction and technical re-equipment; work on the installation of power, technological and other equipment.
Construction object – a separate building or structure with all related equipment, inventory, tools, galleries, flyovers, internal engineering networks and communications, for the construction (reconstruction, expansion) of which an independent object estimate is compiled.
Construction organizations include all general construction and specialized organizations, including repair and construction organizations. The main activity of construction organizations is to perform work under contracts with customers related to the type of economic activity "Construction" in accordance with the state "General Classifier of types of Economic Activities (GCTEA).
The volume of construction work includes the cost of construction work performed by enterprises engaged in construction activities under concluded construction contracts, which includes construction of new facilities, major and current repairs, reconstruction, modernization of residential and non-residential buildings, engineering structures.
The index of the physical volume of construction works (services) is determined by the ratio of the volumes of completed construction works of the analyzed period to the previous period in actual prices, taking into account the deflator (price index).
The total area of a residential building (residential building) is calculated as the sum of the total areas of all dwellings and the areas of all non-residential premises, as well as the areas of parts of a residential building that are common property.
More detailed methodological explanations are available at the following links: