    15.4%
    In January-April 2023, the volume of construction work increased by 15.4% and amounted to 1015.1 billion tenge.
    79.6%
    Of the total volume of construction work in the republic, private construction organizations – 79.6%, foreign – 20.2% and state – 0.2% were performed.
    Volume of completed construction works

    The increase in the volume of construction work in January-April 2023 compared to January-April 2022 is associated with construction and repair of non-residential buildings (by 21%) and structures (by 20.6%).

    By types of construction work (services) performed in January-April 2023, the largest share is occupied by construction of non-residential buildings (21.2%in the total volume) and residential buildings (13.2%).

    Indices of the physical volume of construction work
    as a percentage of the corresponding period of the previous year
    January-April 2023
    Dynamic tables

    In the regional context, an increase in the volume of construction work was observed in all regions of the republic. Significant growth was noted in the regions of Abay (by 59,8%), Zhambyl (by 47.3%), Kyzylorda (by 44%),Mangystau (by 39.4%), Batys Kazakhstan (by 34%),Zhetisu (by 21.4%), Soltustik Kazakhstan (by 19.2%), Atyrau (by 17.8%), Aktobe (by 15%) regions and in the city of Shymkent (by 23.7%).

    The volume of completed construction works (services)
    Total, thousand tenge April 2023 as a percentage to January-April 2023 as a percentage to January-April 2022 As a percentage of the republican volume
    March 2023 April 2022
    Republic of Kazakhstan 1 015 053 825 82,0 114,5 115,4 100,0
    Abay 25 636 663 50,1 168,7 159,8 2,5
    Akmola 18 303 591 68,1 97,5 100,5 1,8
    Aktobe 38 120 730 64,3 77,4 115,0 3,7
    Almaty 34 302 449 89,7 126,8 101,8 3,4
    Atyrau 269 075 864 154,5 118,4 117,8 26,5
    Batys Kazakhstan 38 292 447 112,4 259,7 134,0 3,8
    Zhambyl 39 734 296 56,8 210,5 147,3 3,9
    Zhetisu 16 749 810 131,5 97,6 121,4 1,7
    Karaganda 54 270 479 73,6 85,4 102,8 5,3
    Kostanai 31 025 628 68,7 116,3 112,2 3,1
    Kyzylorda 19 458 800 39,1 165,0 144,0 1,9
    Mangystau 47 061 437 46,0 127,8 139,4 4,6
    Pavlodar 26 065 153 101,9 92,0 106,1 2,6
    SoltustikKazakhstan 16 920 317 46,8 181,4 119,2 1,7
    Turkistan 46 900 415 93,0 103,4 112,9 4,6
    Ulytau 19 861 810 105,9 135,4 109,5 2,0
    Shygys Kazakhstan 47 533 643 71,6 95,9 108,5 4,7
    Astana city 93 258 267 113,9 119,5 113,0 9,2
    Almatycity 105 682 055 31,3 86,8 100,8 10,4
    Shymkent city 26 799 971 66,5 113,3 123,7 2,6
    Spreadsheets
    Commissioning of residential buildings

    In January-April 2023, the total area of new facilities put into operation amounted to 4 937.9 thousand square meters.

    Indices of the physical volume of commissioned housing
    as a percentage of the corresponding period of the previous year
    January-April 2023
    Dynamic table

    The total area of housing commissioned increased by 19.9% compared to January-April 2022 and amounted to 4 329.4 thousand sq.m., of which 2 474.8 thousand sq.m. - multi-apartment and 1 823 thousand sq.m. - individual houses. Most of the housing – 4 150.4 thousand sq.m. or 95,9% was put into operation by private developers, of which the population is 1 843 thousand square meters.

    Total area of commissioned residential buildings
    Residentialbuildingscommissioned includingdevelopers
    sq. meters of total area as a percentage of the corresponding period of the previous year stateproperty privateproperty ofthem foreignproperty
    population as a percentage of the corresponding period of the previous year
    Republic of Kazakhstan 4 329 386 119,9 117 565 4 150 432 1 842 957 99,0 61 389
    Abay 60 155 105,3 - 60 155 28 947 118,2 -
    Akmola 211 984 105,5 х х 112 606 100,3 х
    Aktobe 204 656 101,1 1 417 203 239 123 544 105,1 -
    Almaty 316 210 131,0 5 325 х 221 600 108,2 х
    Atyrau 167 659 71,4 - 153 381 137 081 86,1 14 278
    Batys Kazakhstan 123 632 102,1 1 241 122 391 55 763 97,4 -
    Zhambyl 155 134 105,0 12 803 142 331 123 878 87,5 -
    Zhetisu 56 571 106,6 5 116 51 455 42 141 95,6 -
    Karaganda 177 664 113,9 12 949 164 715 29 213 68,9 -
    Kostanai 146 097 104,5 11 833 134 264 55 999 78,2 -
    Kyzylorda 174 345 102,4 4 403 169 942 166 136 100,4 -
    Mangystau 191 543 60,3 - 191 543 94 459 48,5 -
    Pavlodar 55 153 107,4 - 55 153 29 087 156,7 -
    SoltustikKazakhstan 35 618 111,1 - 35 618 31 840 134,6 -
    Turkistan 164 674 113,8 - 164 674 164 674 126,3 -
    Ulytau 21 458 117,3 2 901 18 557 12 413 165,6 -
    Shygys Kazakhstan 65 561 107,4 9 102 56 459 19 113 81,6 -
    Astana city 958 992 127,7 х 915 196 20 104 62,7 -
    Almatycity 835 240 224,8 - 835 240 248 731 136,2 -
    Shymkent city 207 040 148,5 4 152 202 888 125 628 116,9 -

    In the field of education and healthcare, in January-April 2023, 9 general education schools for 2 974 student places, 10 preschool institutions for 516 places, 1 hospital for 150 beds and 1 clinic for 525 visits per shift were put into operation.

    Commissioning of social and cultural facilities
    January-April 2023
    Spreadsheets
    Glossary

    Construction and installation work – construction work on the construction of buildings and structures, expansion, reconstruction and technical re-equipment; work on the installation of power, technological and other equipment.

    Construction object – a separate building or structure with all related equipment, inventory, tools, galleries, flyovers, internal engineering networks and communications, for the construction (reconstruction, expansion) of which an independent object estimate is compiled.

    Methodological explanations

    Construction organizations include all general construction and specialized organizations, including repair and construction organizations. The main activity of construction organizations is to perform work under contracts with customers related to the type of economic activity "Construction" in accordance with the state "General Classifier of types of Economic Activities (GCTEA).

    The volume of construction work includes the cost of construction work performed by enterprises engaged in construction activities under concluded construction contracts, which includes construction of new facilities, major and current repairs, reconstruction, modernization of residential and non-residential buildings, engineering structures.

    The index of the physical volume of construction works (services) is determined by the ratio of the volumes of completed construction works of the analyzed period to the previous period in actual prices, taking into account the deflator (price index).

    The total area of a residential building (residential building) is calculated as the sum of the total areas of all dwellings and the areas of all non-residential premises, as well as the areas of parts of a residential building that are common property.

    More detailed methodological explanations are available at the following links:

    Release responsible:
    Department of Production and Environment statistics
    Department Director:
    A. Shauenova
    Tel. +7 7172 749056
    Executor:
    B.Dubirova
    Tel. +7 7172 749313
    E-mail: ba.dubirova@aspire.gov.kz
    Address:
    010000, Astana city
    Mangilik el avenue, 8
    House of Ministries, Entrance 4